02
Wayfinding
2024
Summary
Client
Linea Regional Rail

02
The project
Credits
Lead: Jonas Brekke
Design: Theo Laine, Lea Moretti
Engineering partner: Studio Faro
The brief
Forty-one stations, three operators and nineteen kinds of sign. Passengers missed connections because the signs disagreed with each other.
The idea
We cut the system down to four sign types and one arrow. Every sign answers one question. If a sign needs a second sentence, it is the wrong sign.
Testing
We printed full-size signs on foam board and timed 200 commuters reading them at walking pace. Anything slower than three seconds was redrawn.
The outcome
The first twelve stations opened in March. Missed-connection complaints fell by a third in the first quarter.
03
Images

Fig. 1

Fig. 2

Fig. 3